The Albion Solar and BESS Project is a 140 MWdc solar photovoltaic project with a 200 MWh battery energy storage system, located in Banner County, Nebraska, USA. The project has secured site control, completed initial Environmental Studies and selected a Point of Interconnection (POI). Once operational, the Albion Project is expected to generate enough electricity to power approximately 19,524 homes.
140 MWdc
SOLAR
200 MWh
BESS
19,524
Homes Powered
Timeline
- Site Selection
- Feasibility Studies
- Permitting Applications in Progress
- Permitting Applications Approved
- Construction
- Operation