Albion

Overview

The Albion Solar and BESS Project is a 140 MWdc solar photovoltaic project with a 200 MWh battery energy storage system, located in Banner County, Nebraska, USA. The project has secured site control, completed initial Environmental Studies and selected a Point of Interconnection (POI). Once operational, the Albion Project is expected to generate enough electricity to power approximately 19,524 homes.

    • 140 MWdc

      SOLAR

    • 200 MWh

      BESS

    • 19,524

      Homes Powered

Timeline

  1. Site Selection
  2. Feasibility Studies
  3. Permitting Applications in Progress
  4. Permitting Applications Approved
  5. Construction
  6. Operation

Location