Corry

Overview

The Corry Solar and BESS Project is a 325 MWdc solar photovoltaic project with a 400 MWh battery energy storage system, located in Hale County, Texas, USA. The project has secured site control, completed initial Environmental Studies and selected a Point of Interconnection (POI). Once operational, the Corry Project is expected to generate enough electricity to power approximately 35,431 homes.

    • 325 MWdc

      SOLAR

    • 400 MWh

      BESS

    • 35,431

      Homes Powered

Timeline

  1. Site Selection
  2. Feasibility Studies
  3. Permitting Applications in Progress
  4. Permitting Applications Approved
  5. Construction
  6. Operation

Location