Horizon Line
Overview
The Horizon Line Energy Storage Project is a 33.6 MWh BESS (Battery Energy Storage System) utilising a 2 hour battery system located in Alberta, Canada. The project has secured control of the 8.8 acre site. The project has completed feasibility studies and is currently at Stage 1 in the AESO Connection Process.
33.6 MWh
BESS
Timeline
- Site Selection
- Feasibility Studies
- Permitting Applications in Progress
- Permitting Applications Approved
- Construction
- Operation
Location
