Swift Fox

Overview

The Swift Fox Energy Storage Project is a 15.2 MWh BESS (Battery Energy Storage System) utilising a 2 hour battery system located in Alberta, Canada. The project has secured control of the 7.3 acre site. The project has completed feasibility studies and is currently at Stage 1 in the AESO Connection Process.

    • 15.2 MWh

      BESS

Timeline

  1. Site Selection
  2. Feasibility Studies
  3. Permitting Applications in Progress
  4. Permitting Applications Approved
  5. Construction
  6. Operation