Eastervale

Overview

The Eastervale Solar and BESS Project is a 345 MWdc solar photovoltaic project with 400 MWh battery energy storage system located in the Municipal District of Provost, Alberta, Canada. The project has submitted an application for approval to the Alberta Utilities Commission (AUC) and is currently in Stage 3 in the AESO Connection Process. Once operational, the Eastervale Project is expected to generate enough electricity to power approximately 58,333 homes.

    • 345 MWdc

      SOLAR

    • 400 MWh

      BESS

    • 58,333

      Homes Powered

Timeline

  1. Site Selection
  2. Feasibility Studies
  3. Permitting Applications in Progress
  4. Permitting Applications Approved
  5. Construction
  6. Operation

Location