RED WILLOW
Installed Capacity:
295 MWp
BESS Capacity:
100 MW / 200 MWh
Status:
Stage 2 AESO
Location:
Alberta, Canada
The Red Willow Project target capacity is 295 MWp solar photovoltaic and 100MW/200MWh of Battery Energy Storage System
(“BESS”) with a two-hour battery duration.
The Red Willow Project is in Stage 2 of the Alberta Electric System Operator (“AESO”) interconnection process. Westbridge recently submitted environmental and wildlife field studies to Alberta Environment and Parks (“AEP”), in a request for a Referral Letter, which will be then submitted to the Alberta Utility Commission (“AUC”) as part of Red Willow’s application for power plant approval.